Tuesday, 20 August 2024

15. We have a datum

 I have today glued down a strip of cork wide enough for


the double track siding in the Mill and set at the desired angle.

The turnout is ready for the switch rails to be soldered to the tire bar pins.

So with the cork down we have a datum and can get on with laying things and making more models!


No comments:

Post a Comment

48. Telling a story

Called in to a flat we’re looking after today and took up the owner’s invitation to run the train around his desk. It was a Hornby TT120 fre...