Its been a while, so heres a general update on assorted projects.
1. Coales Mill Yard -2mm FS.
The buildings for the mill continue to grow slowly. The track for the 2 sidings is built, including a turnout. I've ordered track glue from stores and that will go down next on the prepared cork base.
2. Greygates Works - 4mm
Some slow progress on the brake gear for a fruit van is almost complete.
3, Johnson’s Wharf - 4mm
Remains a paper exercise so far. However, this lovely little inter-building bridge from Fair Price Models arrived this morning and is already being assembled. Its so nice! The basic MDF shell just went together with white glue and the beautifully detailed multi-layered sides (laser board whatever that is) are next- though I will likely paint them first.
I’m confident it will find a home on Johnson’s.
Not much else to report - but the Scammell Pioneer is almost fully assembled and partially painted. this has been a very nice kit to build and it has presented few problems beyond those of my own making. Some very small detail parts have needed eyeware to ensure a good placement.
The only real issue I have had is the front wheel and steering assembly, which refuses to stay attached to the vehicle. They are mounted on two tiny points of contact along the centreline of the chassis and it looks like I may have to resort to Loctite and hope it goes well.

Comments
Post a Comment