I'm still out of space as Operation Christmas has overtaken the kitchen table, so any modeling is being undertaken on my knee using the lid of one of many Really Useful Boxes (RUB) in which I store everything. These are pretty good at keeping things safe in the garage, which is where most of it lives.
Anyway, work has commenced on a variation of the Scalescenes canal boxfile. I can't say much more than that because I'm still thinking very hard about how I'm going to use it. The same goes for the inter-building bridge which is glazed and mostly assembled. I'd pre-painted the side panels and the roof so it looks great now that its all together. I've also been building a pipe-bridge to hang below it. Construction is from plastic strip and tubes I've had laying about for decades. Mostly just needs painting now.
The Stores have received a very nice 009 Glyn Valley brake from Nigel Brooks. This is another 3D-printed kit and I'm looking forward to painting it.
Update: January 11th - Christmas took over, the printer died, modeling hit the buffers, and now it's January…

Comments
Post a Comment